WSH紫外明渠
WTV紫外垂直模块
ZL大型管道式紫外
CLEAR中压紫外
MOL板式臭氧发生器
UV-AOP高级氧化
D.FITE滤布滤池
ZL大型管道式紫外
CLEAR中压紫外
UV-AOP高级氧化
Extrem中压紫外
EX-Ue紫外
EX-UPW-TOC紫外
MOM板式臭氧发生器
MOS板式臭氧发生器
UV-Fenton光芬顿
UV-Oxidation紫外光氧化
EX-L紫外消毒器
EX-U紫外消毒器
ZL大型管道式紫外
CLEAR中压紫外
One-UV紫外消毒器
Extrem中压紫外
UV-AOP高级氧化
MOS板式臭氧发生器
COG板式臭氧发生器
UV-Fenton光芬顿
中压UV-Oxidation紫外光氧化
光解
巴氏消毒替代
光催化
低压UV-Oxidation紫外光氧化
光选机
并联机器人
直角坐标机器人
赛博一体化集装箱污水处理
D.FITE滤布滤池
模块化污水处理
Modu Ozone板式臭氧
Pilotscale experiment
ONYX has several sets of modular photochemical water treatment pilot equipment, which provide pilot continuous flow and intermittent flow tests based on ultraviolet photochemical advanced oxidation reactions and advanced reduction reactions for high-salinity wastewater, highly toxic wastewater and difficult-to-degrade wastewater.
相关介绍
The main pilot equipment includes the following:
UV/Hydrogen Peroxide
UV/Ozone/Hydrogen Peroxide
UV Photolysis
UV Thin-Layer Disinfection Equipment
UV Thin-Layer Cyclone Oxidation Equipment
Ozone Catalysis
Conducting a water treatment pilot test is a necessary step in the transition to engineering scale-up after completing a small-scale laboratory test and determining the technical route. Its core objectives are threefold: ① Verify the stability of pilot test parameters under continuous flow conditions at the m³·d⁻¹ scale;
② Obtain calibration data for scale-up factors (residence time, UV power density, oxidant dosage, byproduct control, etc.);
③ Form the basis for the process package and commercial quotation for subsequent 10–100 m³·h⁻¹ demonstration units.
The following process has been used in pilot project validation for numerous domestic companies (including pharmaceutical, dye, pesticide, TDI, and other companies dealing with high-COD, salt-containing wastewater) and can be directly used as a blueprint for their SOPs or technical agreements.
I. Project Startup
1.1 Technical Briefing
1.2 Signing of the Pilot Plant Technical Service Agreement
1.3 On-site HSE Briefing
II. Pilot Plant Design
2.1 Process Route
• Mainstream: UV/H₂O₂ (or UV/O₃, UV/H₂O₂/O₃, UV/PS) homogeneous system
2.2 Required Units
2.3 Instrumentation and Control
III. On-site Installation and Commissioning
3.1 Installation Period: 1–2 weeks (can be shortened to 3 days for skid-mounted integrated equipment).
3.2 Commissioning Steps: Clean Water Test, Low-Load Operation, Gradual Switch to Raw Water Operation
IV. Continuous Operation and Data Collection
4.1 Design of the Operating Condition Matrix
4.2 Analysis Indicators and Frequency
V. Data Organization and Process Package
5.1 Key Scale-up Parameters
5.2 Pilot Plant Report Contents (for Owner/EIA/Expert Review)
① Wastewater Source and Properties;
② Process Route and Plant Photos;
③ Continuous Operation Curves;
④ Energy and Material Consumption (kWh·kg⁻¹ COD, kg H₂O₂·kg⁻¹ COD);
⑤ Byproducts and Toxicity Changes;
⑥ Issues and Solutions;
⑦ Demonstration Plant Investment and Operating Cost Estimation (CAPEX/OPEX)
VI. Completion and Handover
• On-site dismantling or conversion to a demonstration unit
• Technical briefing meeting: Hand over the operating manual and spare parts list to the owner's process, instrumentation, safety and environmental protection, and maintenance departments.
系统参数